Road Closure

Cheshire East Highways – Traffic Management Area Highway Group Report

For your information, please find attached the Traffic Management Area Highway Group Reports for works with various forms of temporary traffic control (e.g. traffic signals, road closure etc.).

The two Reports show Works that are both ‘Proposed’ and Works that are ‘In Progress’ over the following two week period.

Proposed :

Street Works – Proposed Congleton AHG12_04_2018 00_00_00

Street Works – Proposed Congleton AHG08_03_2018 00_00_00  

Street Works – Proposed Congleton AHG15_02_2018 00_00_00

Street Works – Proposed Congleton AHG01_02_2018 00_00_00

Progress:

Street Works – In Progress Congleton AHG12_04_2018 00_00_00

Street Works – In Progress Congleton AHG08_03_2018 00_00_00

Street Works – In Progress Congleton AHG01_02_2018 00_00_00

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s